Non-Recurring Engineering Charge (NRE)

Non-Recurring Engineering Charge (NRE)


A non-recurring engineering or NRE charge is for customers that require design work for a project, but do not leave tangible collateral at The Next Jump HQ to work from. This is for proof of concept design work. Not the final cost of the project.

Hard costs will be added once the customer approves the proof of concept design and added to the bill of materials (BOM) for the project once the design is approved.. 

Regular price$2,500.00
/

Description

This section doesn’t currently include any content. Add content to this section using the sidebar.

Build Your Own

Upfit Your Mid-Size Long Bed Truck

Specs

Model

Manufacturer

Included Components

Item Dimensions (LxWxH)

Item Weight

Features

Color

Material

Suggested Uses

Compatible

Vehicle

Warranty Description